Chic new-build 5 flats and one office-Clapton
North londonWe’ve been working with this developer for nine years. They specialize in high-end residential new builds and this project consisted of five flats and 1 office. We won this tender as this developer trusted our quality and standard of work and we were able to price the job very competitively.
What we did on this project – the summary
Full electrical works on this project entailed a fire alarm and AOV system, new wiring, a water pump to give the showers in the block that extra kick of power, solar panels, and lighting both inside and out.
The challenge
The challenge of this project was designing the lighting and power supplies. Everything we do is done with care but when you are responsible for the electrics in a development where the average price of each apartment is over £600,000 and the client demands a high-end installation, the expectations we place on ourselves are inevitably higher than usual.
- Cabling – The entire development required wiring with high-end cables to ensure reliability, safety, and capacity boxes were all ticked for a development of this scale and quality.
- Fire Alarms/Smoke Alarms/AOV System – Smoke detectors, fire alarms, and an AOV smoke ventilation system designed to draw the smoke into the stairwell of the blocks and open windows/vents at the top to let it out enables safer evacuation of the building should the worst happen.
- Solar Panels – With public awareness of the environmental impact of fossil fuel use in electricity production, some developers look to add solar panels to their properties to improve their saleability. For others, it’s the energy cost savings that can be achieved thanks to a lower reliance on the National Grid that will make their properties more appealing to buyers in the area. Either way, we have seen an increase in demand for this side of our work.
- Lighting and LED lighting – In this project we designed the lighting layout, making sure that lighting was appealing and attractive and at the same time cost-effective. Safety is a big concern for buyers in North London – it was, therefore, of importance to the developer that the lighting in the car park and bike shed areas of the property were bright and reliable to give the property owners that added feeling of comfort and security.
The development took nine months to complete and the work was finished to the client’s satisfaction, to the expected quality standards, and was finished on schedule. The apartments are now on sale and we’re looking forward to our next project with this client.
WHAT WE DID